// todo need optimize like in event.jsp. Add indexing or not indexing this page. End of Rollout Period (14 h 30 m, 29 fev 2020 ano – 15 h 30 m, 29 fev 2020 ano) (Linha do tempo)
30
/pt/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
1158153
348309
2

End of Rollout Period (14 h 30 m, 29 fev 2020 ano – 15 h 30 m, 29 fev 2020 ano)

Descrição:

At the end of the rollout period, all systems should have been updated to version 1.4. The Router will switch the validation of the new fields from optional to MANDATORY.
In order to protect the primary repositories, an additional 2 day buffer period is implemented on the Secondary repository to take into consideration the "in-flight" version 1.2 messages that are being routed and processed in the primary repositories .
All EO should send version 1.4 messages. Only the Primary repositories might have version 1.2 messages in their internal queues. These messages will be accepted by the EU Secondary until March 2nd.
Note that the routing rules are not updated at this stage yet.

Adicionado na linha do tempo:

Data:

14 h 30 m, 29 fev 2020 ano
15 h 30 m, 29 fev 2020 ano
~ 60 min