33
/pt/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Criar
Close
Create a timeline
Public timelines
Library
FAQ
Editar
Baixar
Export
Criar uma cópia
Premium
Incorporar ao site
Share
Senior Project
Category:
Outro
Atualizado:
8 dez 2017
0
0
485
Autores
Created by
Zack Teitelbaum
Attachments
Comments
Eventos
Registered for EMSE 398
Initiated project
Iron targets ordered $ (300)
Concept Paper drafted
Joined iLab for sputter access
Concept Paper submitted
PowerPoint Slide drafted
PowerPoint Slide submitted
Registered for EMSE 399
Proposal presentation
Proposal document
Precision saw training
EvoVac Deposition System training
Final report
Commencement
Mid-semester presentation
$ (13,866.24)
Períodos
Literature review
Gas mixture math $ (200)
Create sputter substrates $ (20) $ (30)
Film depositions
Film analysis SCSAM $ (80)/h Laue $ (800)
$ (33.50)/h 56 h $ (1876)
$ (33.50)/h 112 h $ (3752)
Fringe: 30% $ (1688.40)
University overhead: 60% $ (5199.84)
About & Feedback
Acordo
Privacidade
Biblioteca
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments