GTG-5 RCFA
Criada
Xianghao Eng
⟶ Atualizado 13 fev 2020 ⟶
List of edits
Comentários
Eventos
SCR installed
PT installed
PT, exhaust duct and generator checked for leaks/ oil accumulation
Reported smoke from PT bearing casing, PT seal air needle valve (Item 27) adjusted
PT seal air needle valve (Item 27) adjusted
PT seal air pressure step drop
PCV replaced, XSV tested
Reported no smoke from bearing casing
Tested engine stage 8 air performance
Tested influence of SCR
Resealed PT bearing cover, coupling guard
PT removed
PT installed, Static seal air test passed
Períodos
SCR and exhaust back pressure deviation
MLO tank level decrease continuously
PT seal air pressure deviation