1 jan 2014 ano - Another hydropower station (95 MW) was built
Descrição:
The Búðarháls Hydropower Station (95 MW) was brought online. The station is located within the Þjórsá- and Tungnaá River water catchment area.
Adicionado na linha do tempo:
Data: