30
/pt/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
June 15, 2024
553907
46952
2

1 jan 2014 ano - Another hydropower station (95 MW) was built

Descrição:

The Búðarháls Hydropower Station (95 MW) was brought online. The station is located within the Þjórsá- and Tungnaá River water catchment area.

Adicionado na linha do tempo:

Data:

1 jan 2014 ano
Agora
~ 10 years ago