DS emailed APTS a basic list of required documents
APTS personnel mobilised to site and started NDT
KH requested Valmec to specify the documents that they need to submit
DS sent APTS reminder for documentation (hadn't received any) (first send of SDRL)
Valmec Doc Con sent APTS the APA plans and specifications
DS reminded APTS to submit requested documentation (hadn't received any)
Valmec Doc Con sent APTS notification of APA-rejected RT procedure.
DS requested Doc Con send APTS the APA plans and specifications
SC submitted APTS RT/MT procedures to Valmec Doc Control
DS sent APTS hydro test request specification form
X-ray tube damage incident
IB confirmed APTS were awarded Yamarna work. Tender specified that all hydro works were B31.3
APA sent Valmec formal notice of work without approval
Valmec SR responded to APA formal notice
Valmec Doc Con sent SR the APTS RT/MT procedures
Valmec Doc Con sent approved RT/MT procedures to APA for review
APTS responded to Valmec regarding APA stop-works
DS developed a SDRL for APTS works (but not sent)
JR queried with SC that RT/MT procedures were still not approved by APA SC advised JR they were still with APA (but thought they were lodged much earlier)
JR queried with SC that RT/MT procedures were still not approved by APA SC advised JR they were still with APA
JR queried with SC that RT/MT procedures were still not approved by APA SC checked with SR. Advised they'd been lodged and to wait and see.
Periods
NDT schedule as at 16/04
APTS gear mobilised
NDT Schedule as at 11/04
NDT schedule as at 26/04
APTS gear packed
KH (main contact) away from office