Events
Outline the sensor selection
Finish the preliminary evaluation of sensor performance
Complete the discussion and analysis of the results from simulink
Update the timeline, and finish editing the step 2 report
Step 3 of the project is due
Complete the outline for the preliminary analysis required for actuator selection, and refine actuator specs
Finish outlining the possible actuation options and complete preliminary concept generation and selection
Complete the preliminary evaluation of the sensor and actuator performance
Complete the discussion and analysis of the results
Update the timeline and finish editing the report for step 3
Final Report Due
Complete the Grade distribution and finish editing the report
Complete the performance specifications and constraints
Complete the analysis supporting the choice for the sensors
Complete the Kinematic model of the system
Complete the analysis supporting the choice of actuators, drive electronics, control device and power supply
Complete the analysis showing the designed system will meet the specifications and constraints
Complete the assembly drawing
Step 1: Specifications and Requirements Due
Finish specifications, requirements, objectives, constraints and timeline
Finish editing Step 1 Report
Step 2: Preliminary Sensor Selection Due
Finish researching sensor options
Finish concept selection and generation