33
/fr/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
773263
240213
2
Public Timelines
FAQ

MDM DATALAKE IMPLEMENTATION PHASE 1 (30 avr. 2019 – 19 août 2019)

Description:

Classification and Collection Methods
ETLS
Missing fields
Variables not captures
Variables not mapping

• Determine how the processes interact to enable the achievement of the organization’s objectives.
• Develop a logical document and process hierarchy

Within each process
• Agree the ‘purpose’ and ‘scope’ of each process
• Identify what work is done, who carries it out and how it is performed
• Identify the resource needs (in terms of individuals, finance and equipment)
• Clarifying the constraints or requirements that affect how the process operates
• Make sure the inputs and outputs are identified

Ajouté au bande de temps:

Date:

30 avr. 2019
19 août 2019
~ 3 months and 21 days