33
/fr/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
553576
167834
2
Public Timelines
FAQ

Cost Analysis (1 déc. 2018 – 5 déc. 2018)

Description:

-Checking the types of material available
-Selecting the most effective and economical material for the turbine.
-Checking on cost of other accessories required to install the turbine.
-Checking on the installation cost.
Finding means to reduce on the overall cost of the project.

Ajouté au bande de temps:

Date:

1 déc. 2018
5 déc. 2018
~ 4 days