Prototype Testing (10 h 2 min, 20 févr. 2018 ans – 23 h 1 min, 2 avr. 2018 ans)
Description:
- The testing of the prototype will be conducted as soon as the prototype is built. The reason it overlaps with the building of the prototype is because if the prototype needs to be changed based on testing we will have time to modify the design and figure out design alternatives
- Verify photodetection circuit is working correctly
- Compare with theoretical values previously calculated
- Verify components can be autoclaved
- We will check the specifications for the temperature requirements and use a UV light for the other parts
- Verify parts will not oxidize
- This can be done by coating parts in silicon grease and leaving them in the incubator to see if they will oxidize. Visual inspection.
Ajouté au bande de temps:
Date:
10 h 2 min, 20 févr. 2018 ans
23 h 1 min, 2 avr. 2018 ans
~ 1 months and 11 days