ISO Civil Engineering as-built
Éditer
mise à jour avec succès 10 sept. 2022
0
0
141
Share
Auteurs
Created by
Samuel Borreguero
List of Edits
Attachments
Comments
ISO III
By
Samuel Borreguero
1 oct. 2022
0
0
347
TIA #10 Canopy
By
Samuel Borreguero
23 sept. 2019
0
0
278
Los TEROS ANDATEC Argentina
By
Samuel Borreguero
il y a 19 jrs
0
0
261
CSJ COVID
By
Samuel Borreguero
25 août 2020
0
0
242
Timeline Update TEDAGUA
By
Samuel Borreguero
3 sept. 2020
0
0
235
Propuesta OMAN TIEMPO
By
Samuel Borreguero
14 mai 2020
0
0
227
CAA CELEC IRAO
By
Samuel Borreguero
10 juil. 2020
0
0
219
TIA #14 UFC ELEM
By
Samuel Borreguero
21 déc. 2020
0
0
203
New timeline
By
Samuel Borreguero
27 mai 2019
0
0
199
TRAFOS MUELLE
By
Samuel Borreguero
16 oct. 2020
0
0
195
TEROS ANDTEC
By
Samuel Borreguero
24 nov. 2020
0
0
183
ISO II
By
Samuel Borreguero
18 juin 2022
0
0
155
WAGEMANN Colpatria
By
Samuel Borreguero
13 juil. 2022
0
0
142
Power Transformer
By
Samuel Borreguero
14 juil. 2022
0
0
135
ISOTRON Timeline
By
Samuel Borreguero
14 juin 2022
0
0
133
ISOTRON MV Cells
By
Samuel Borreguero
8 juil. 2022
0
0
132
EVENTOS
By
Samuel Borreguero
11 sept. 2022
0
0
127
Platform construction ISO
By
Samuel Borreguero
5 juil. 2022
0
0
119
COMM at Sectioning Substation
By
Samuel Borreguero
27 sept. 2022
0
0
119
AS PLANNED
By
Samuel Borreguero
10 sept. 2022
0
0
118
PITIQUITO
By
Samuel Borreguero
12 oct. 2022
0
0
115
PLANTEAMIENTO PITIQUITO
By
Samuel Borreguero
il y a 10 mois
0
0
114
UTE Strike
By
Samuel Borreguero
24 oct. 2022
0
0
109
ESPIREA Ventana #1 Evento #1
By
Samuel Borreguero
20 juin 2023
0
0
98
Sectionin works at Sect. Line
By
Samuel Borreguero
13 juil. 2022
0
0
95
Ventanas Edif B
By
Samuel Borreguero
20 juin 2023
0
0
90
Grounding Mesh Elevating SET
By
Samuel Borreguero
14 juil. 2022
0
0
87
APAB PITIQUITO
By
Samuel Borreguero
il y a 10 mois
0
0
78
Planned CSOW
By
Samuel Borreguero
il y a 10 mois
0
0
54
PAX TERMINAL DRAGADOS SCENARY #7 PRECONS MEETING
By
Samuel Borreguero
il y a 1 mois
0
0
48
Les événements
Submission of the general arrangements drawings for Sectioning Substation 11 nov 2019
Initial approval of the general arrangements drawings for Sectioning Substation 15 nov 2019
Final approval of the general arrangements drawings for Sectioning Substation 13 dec 2019
Approval of the general arrangements drawings for Elevating Substation 19 nov 2019
Submission of the general arrangements drawings for Elevating Substation 8 nov 2019
Re-submission of the general arrangements drawings for Elevating Substation 8 nov 2019
Start of the platform works at Sectioning Substation 6 dec 2019
About & Feedback
Un accord
Confidentialité
Bibliothèque
2024
©
Time.Graphics
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Excellent (Trustpilot Reviews)
Based on 115+ reviews
Comments