33
/fr/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Créer
Close
Create a timeline
Public timelines
Library
FAQ
Éditer
Télécharger
Export
Créer une copie
Premium
Intégrer dans le site Web
Share
M60A Conti.
Category:
Autre
mise à jour avec succès:
19 févr. 2020
0
0
287
Auteurs
Created by
johnzhou
Attachments
Comments
M60A shipment plan
By
johnzhou
25 févr. 2020
0
0
229
Les événements
Conti. WH reported M60A 0KM failures
Unit#1 ship back to Conti. WH for re-verification
Conti. WH shiped unit#1 to Micron for FA
Micron received unit#1 and preliminary report shared at same day
Final report shared as NO FAILURE FOUND
Unit#1 failed to re-verification at Conti. WH under this specific condition
Conti. R&D confirmed failure occurred on the fast VCC ramp rate and high temp.
Unit#2 analysis in Continental R&D SGP and Micron FAE involved
Unit#1 sent back again to Micron for replicate
Micron collected the 2nd failure
Replicated failure with the specific condition provided by Conti. R&D
Périodes
Electrical FA @Micron SGP
Confirmed the same failed mode as Unit 1
About & Feedback
Un accord
Confidentialité
Bibliothèque
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments