33
/fr/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 1, 2025
8280468
611827
2
Public Timelines
FAQ Obtenir le Premium

6 avr. 2023 - (GERMANY) Battery train operation in the Bavarian Forest technically possible but expensive

Description:

A new report published by Bavarian passenger transport firm Bayerische Eisenbahngesellschaft (BEG) has revealed that the operation of battery-powered hybrid trains in the Bavarian Forest is “technically possible”, but it would require significant investment and a lead time of at least 10 years.

Ajouté au bande de temps:

Date:

6 avr. 2023
Maintenaint
~ Il y a 2 ans et 6 mois