33
/fr/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
7668279
725563
1
Public Timelines
FAQ

1 mars 2000 - Voters pass bond to renovate/expand the Library

Description:

Voters pass a $7.9 million bond in March 2000. Architectural firm of Fletcher, Farr, and Ayotte (now FFA Architecture and Design) is hired to do the design work and DPR Construction is awarded the contract to build and renovate the facility.

Ajouté au bande de temps:

Date:

1 mars 2000
Maintenaint
~ Il y a 25 ans