18 h 2 min, 20 sept. 2021 ans - Spawn work begins
Description:
Spearheaded by ari and Punny__, Spawn was set up in a plains on the first posing an initial challenge of spawn proofing. Following the Dragon Fight and torch spam, the pair began work on a plaza, repositioning the Nether Portal, and a road network.
Ajouté au bande de temps:
Date:
18 h 2 min, 20 sept. 2021 ans
Maintenaint
~ Il y a 3 ans et 9 mois