14 h 15 avr. 1986 ans - Cooling disabled

Description:

Reactor 4's emergency cooling system turned off for the test. The test is delayed as power is required for the grid, power remains at 50% instead of the 30% scheduled for testing.

Ajouté au bande de temps:

ByJB
10 mai 2021
0
0
189

Date:

14 h 15 avr. 1986 ans