30
/fr/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
2047528
170532
2

25 avr. 2014 - Switch To The Flint River

Description:

While construction of the pipeline to a local watershed occurred, they needed a temporary source of water... the Flint River! In the past it was safe, and they would not treat the water right away.

Ajouté au bande de temps:

1 nov. 2018

Date:

25 avr. 2014
Maintenaint
~ Il y a 10 ans