30
/fr/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
1346930
105714
2

23 janv. 2019 - DAN 7

Description:

Detailed Drawings:

A full set of detailed engineering drawings of the prototype to be built
2. The associated bill of materials
3. The cost of materials and delivery estimates (and associated equipment, if any)
4. A timeline outlining the expected fabrication/manufacturing schedule (Gantt chart) with
appropriately detailed activities

Ajouté au bande de temps:

8 juil. 2018

Date:

23 janv. 2019
Maintenaint
~ Il y a 5 ans et 4 mois