13
/
en
AIzaSyCYaC8UkdPkQKLFUmpasLV5eC3M802CrcA
88481
8164
1

nov 6, 2005 - During the Superfund Preliminary Assesment, PREQB saw metal debris on the floor, ink that was allowed to drip directly onto the floor, corroded 55-gallon drums without secondary containment, and ink stained soil around the facility.

Added to timeline:

10 months ago
0
0
102
New timeline

Date:

nov 6, 2005
Now
~ 12 years ago
FeedbackAboutTermsPrivacy