Noble Move in
Creado
connie
⟶ Actualizado 22 ene 2018 ⟶
List of edits
Comentarios
Eventos
Noble Move in
Workframe: Finalize Move Vendor
TWCC- Ordered Cable trays
TWCC: Cable Trays Delivered?
HTE: Provide cable tray specs to TWCC
TWCC: Cleaning
TWCC electrician to provide Noble price for updated spec
Kimyen: Send Door + Hardware Schedule to TWCC
Kimyen: Send to TWCC the following Refrigerator, Kristom, Accent Paint, Dishwasher
Kimyen: send drawing with measurements of tv locations and heights to TWCC
TWCC to provide log of all changes and prices for review and approval by Noble
Kimyen to provide drawings with dimensions to TWCC for the coat closet
Kimyen: provide drawings with dimensions to TWCC for the glass
Kimyen: to provide specifications of the Tag Wall to HTE.
TWCC confirmed that they have received the Tagwall price
HTE: provide specification of battery powered blackout shade for John’s office for review and approval.
Kimyen: to provide specification of fabric panels.
Kimyen to provide the specification for the white window shade.
Workframe: Blocking window in IT room
Kimyen: Provide exact placement of TVs to TWCC
HTE: Provide Noble a redesign of equipment placement
Kimyen to give the specs to TWCC for the carpet in the huddle rooms
Workframe: Vitatech engineer to provide proposal for Faraday cage
HTE: needs to provide BTU for their equipment
HTE to coordinate with TWCC about low voltage
HTE to provide company information who is comfortable with installing Infinias system (security)
Progreso del evento
TWCC: Installation of Cable Trays
TWCC: two boxes on the wall in the IT room
TWCC: Add silicon to glass
Workframe: find an engineer to check the AC unit in the IT room