KK - OU Timeline
Creado
Kyle
⟶ Actualizado 26 jul 2018 ⟶
List of edits
Comentarios
Eventos
GMP 1 06/16/17
GMP 2 09/07/17
GMP 3 12/14/17
GMP 4
Poner en grupo
Preconstruction Reports
Eventos
Preconstruction Budget Report 1 04/18/17 based on documents issued on 03/14/17
Preconstruction Budget Report 2 06/16/17 based on documents issued on 04/25/17
Preconstruction Budget Report 3 09/18/17 based on documents issued on 07/25/17 and 08/08/17
Preconstruction Budget Report 4 12/07/17 based on documents issued on 09/05/17, 09/22/17, and 10/12/17
Preconstruction Documents
Eventos
50% Enabling CD's 03/14/17
100% C&S SD's 03/14/17
100% C&S DD's 04/24/17
100% Interior Fitout SD's 04/25/17
75% C&S CD's 07/25/17
100% Interior Fitout DD's 08/08/17
95% C&S CD's 08/15/17
50% Interior Fitout CD's 09/12/17
75% Interior Fitout CD's 10/24/17
Construction Documents "PR's"
Eventos
PR-1 Enabling Pkg 05/31/17
PR-2 Foundation Pkg2 06/06/17
PR-3 Enabling IFC Pkg 06/29/17
PR-4 Foundation Pkg rev2 07/17/17
PR-5 Foundation Pkg rev3 08/11/17
PR-6 Foundation Pkg rev4 08/28/17
PR-7 Core & Shell 100% CDs 09/08/17
PR-8 Drawing Index - revisions 09/22/17
PR-9 Site Electrical Revisions 10/05/17
PR-10 Core & Shell Revisions 10/10/17
PR-11 Mock up Revisions 10/16/17
PR-12 Core & Shell Revisions 10/26/17
PR-13 Core & Shell Revisions 11/06/17
PR-14 Core & Shell Revisions 11/10/17
PR-15 Parking Entry Expansion 11/27/17
PR-15R Parking Entry Expansion 12/05/18
PR-16 Fire Water Tank 12/05/17
PR-17 Fitout Renovations 100% CDs 12/21/17
PR-18 Core & Shell Revisions 12/21/17
PR-19 Low Voltage Networking 01/09/18
PR-20 Temporary Loading Dock 01/23/18
PR-21 Core & Shell Revisions 01/30/18
PR-22 Fitout Revisions 02/13/18
PR-23 Core & Shell Revisions 02/13/18
PR-23R Core & Shell Revisions (AE stamps added) 02/13/18
PR-24 Core & Shell Revisions 03/07/17
PR-26 Core & Shell Revisions 03/30/18
PR-25 Fitout Revisions 03/16/18
PR-27 Mechanical & Civil Updates 04/06/18
PR-28 Core and Shell Reivions 04/13/18
PR-29 Fitout Revisions 04/16/18
PR-30 Door Hardware Revisions 05/01/18
PR-31 Crawl Space Ventilation 05/07/18
PR-32 Interior Glass Revision 05/15/18
PR-33 LL Plumbing Coordination 05/16/18
PR-34 Commissioning and Decorative Glass 05/31/18
PR-35 MEP Revisions 06/07/08
PR-36 Fire Pump Revision 06/18/18
PR-37 Civil Revisions 06/28/18
PR-38 Door Revisions 07/13/18
PR-39 Code Corrections 07/20/18
RFI's
Períodos
RFI 516 Roof Planter Tray Clarifications 06/27/18 - Still Open
RFI 506 Solid Surface Threshold Clarification 06/22/18 - 07/02/18
RFI 497 Mechanical Room Floor Concrete Sealing Clarification 06/14/18 - 06/21/18
RFI 496 Automatic Door Operator Location Clarification 06/13/18 - 06/22/18
RFI 480 Fitout - Wall adjustments Level 1 VDC 05/31/18 - 06/12/18
RFI 474 ICU Door Clarifications 05/24/18 - 06/01/18
RFI 465 Radiation Protection Location 05/18/18 - 06/04/18
RFI 457 Decorative Glazing Clarifications 06/16/18 - 06/06/18
RFI 451 Radiation Protection Clarification 05/15/18 - 05/18/18
RFI 449 Traffic Coating Clarification 05/11/18 - 05/18/18
RFI 448 Window Detail Clarifications 05/11/18 - 05/15/18
RFI 447 Window Types at Nurse Stations B129 & B134 05/09/18 - 05/15/18
RFI 434 OUMC TAB Certification 04/25/18 - 05/04/18
RFI 417 Sliding Automatic Entrances 04/20/18 - 04/24/18
RFI 416 Automatic Door Operators Clarification 04/20/18 - 04/24/18
RFI 411 Automatic Operator Specification Clarification 04/18/18 - 04/18/18
RFI 410 Wall Protection WP10 Clarification 04/18/18 - 04/24/18
RFI 382 Bathroom Interior Elevations 04/10/18 - 06/26/18
RFI 376 Cubicle Curtain Track Clarification 04/04/18 - 04/18/18
RFI 374 Ceiling Finish at Nurse Alcoves 04/04/18 - 04/12/18
RFI 373 Roller Window Shade Material Clarification 04/04/18 - 04/12/18
RFI 372 Roller Window Shade Location Clarification 04/04/18 - 04/12/18
RFI 371 Roller Window Shade Layout Clarification at Conference Room 1201 04/04/18 - 04/12/18
RFI 370 Pocket Detail Clarification for Roller Window Shades 04/04/018 - 04/12/18
RFI 369 Detail at Radius Walls for Roller Window Shades 04/04/18 - 04/13/18
RFI 368 Roller Window Shade Pocket Detail 04/04/18 - 04/12/18
RFI 367 Roller Window Shade Power Coordination 04/04/18 - 04/11/18
RFI 366 Window Treatment Finishes 04/04/18 - 04/12/18
RFI 365 Visual Display Units 04/03/18 - 04/17/18
RFI 364 Defibrillator Cabinets 04/03/18 - 04/17/18
RFI 363 Treads on Monumental Stairs 04/03/18 - 04/12/18
RFI 362 Terrazzo Divider Strip Locations 04/03/18 - 04/11/18
RFI 359 Landscaping in Dining Planters 04/03/18 - 04/12/18
RFI 354 Terrazzo Curb Underneath Monumental Stair 04/02/18 - 04/18/18
RFI 352 Automatic Door Operators Hardware Clarification 04/02/18 - 04/24/18
RFI 345 Tall Cabinet Restraint Requirements 03/29/18 - 04/11/18
RFI 344 Locks for Lockers 03/29/18 - 04/11/18
RFI 342 Drainage Connection Details for Planters 03/28/18 - 04/12/18
RFI 332 Operable Partitions Clarifications 03/26/18 - 05/16/18
RFI 329 Millwork Detail Clarifications 03/23/18 - 04/04/18
RFI 327 Door Hardware Schedule Clarifications 03/21/18 - 04/03/18
RFI 326 Tile Clarifications 03/21/18 - 04/03/18
RFI 325 Fabric Wall System Clarifications 03/20/18 - 04/03/18
RFI 294 Specification Clarifications 03/07/18 - 03/20/18
RFI 291 Locker Details 03/05/18 - 04/05/18
RFI 288 Penthouse Finishes 03/05/18 - 03/13/18