Cost Analysis (1 Dez 2018 Jahr – 5 Dez 2018 Jahr)

Beschreibung:

-Checking the types of material available
-Selecting the most effective and economical material for the turbine.
-Checking on cost of other accessories required to install the turbine.
-Checking on the installation cost.
Finding means to reduce on the overall cost of the project.

Zugefügt zum Band der Zeit:

Datum:

1 Dez 2018 Jahr
5 Dez 2018 Jahr
~ 4 days