33
/de/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Erstellen
Close
Create a timeline
Public timelines
Library
FAQ
Editieren
Herunterladen
Export
Eine Kopie erstellen
Premium
In der Webseite integrieren
Share
Senior Project
Category:
Andere
Wurde aktualisiert:
8 Dez 2017
0
0
482
Autoren
Created by
Zack Teitelbaum
Attachments
Comments
Ereignisse
Registered for EMSE 398
Initiated project
Iron targets ordered $ (300)
Concept Paper drafted
Joined iLab for sputter access
Concept Paper submitted
PowerPoint Slide drafted
PowerPoint Slide submitted
Registered for EMSE 399
Proposal presentation
Proposal document
Precision saw training
EvoVac Deposition System training
Final report
Commencement
Mid-semester presentation
$ (13,866.24)
Perioden
Literature review
Gas mixture math $ (200)
Create sputter substrates $ (20) $ (30)
Film depositions
Film analysis SCSAM $ (80)/h Laue $ (800)
$ (33.50)/h 56 h $ (1876)
$ (33.50)/h 112 h $ (3752)
Fringe: 30% $ (1688.40)
University overhead: 60% $ (5199.84)
About & Feedback
Vereinbarung
Privatheit
Bibliothek
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments