M60A Conti.
Wurde erstellt
johnzhou
⟶ Wurde aktualisiert 19 Feb 2020 ⟶
List of edits
Zeitlinien vom
johnzhou
:
25 Feb 2020
0
0
149
M60A shipment plan
Kommentare
Ereignisse
Conti. WH reported M60A 0KM failures
Unit#1 ship back to Conti. WH for re-verification
Conti. WH shiped unit#1 to Micron for FA
Micron received unit#1 and preliminary report shared at same day
Final report shared as NO FAILURE FOUND
Unit#1 failed to re-verification at Conti. WH under this specific condition
Conti. R&D confirmed failure occurred on the fast VCC ramp rate and high temp.
Unit#2 analysis in Continental R&D SGP and Micron FAE involved
Unit#1 sent back again to Micron for replicate
Micron collected the 2nd failure
Replicated failure with the specific condition provided by Conti. R&D
Perioden
Electrical FA @Micron SGP
Confirmed the same failed mode as Unit 1