M319004 Install Timeline
Wurde aktualisiert 13 Dez 2019
0
0
225
Share
Autoren
Created by
Kuehne Wall
List of Edits
Attachments
Comments
Ereignisse
Tunnel damaged by contractor - Oct 1
Filler enclosure issue Nov 8
Filler will power up 12-02-19 email - Nov 27
Tom Baer in the plant Dec 3
Previous planned production start as of 10-8 - Dec 7
Run prefilled bottles from Chicago - Dec 4
Filler running, no line control - Dec 3
Trip report note - They have put product on the line, that has been run before and trucked in, some of these bottle dont even stand up when on a level surface..... When running product thru the machine I found the product doesnt like standing up at all.
Tom leaves plant after 1st trip, no longer needed - Dec 5
Planned production start date as of 12-5 - Jan 6
Plant request support Dec 6
Support action plan offered Dec 6, tech Monday 12-6
Support plan for Monday tech declined Dec 6
Kevin T in plant to look into failed drive issue - Dec 9
Perioden
Fernando reserved Jan 3 to Jan 10
Install Plan A
Install Plan B
Install Plan C
Install Plan D
Kevin T offered to be in-plant Dec 9 (new drive 12-10)
Tom B offered to be in-plant Dec 16
About & Feedback
Vereinbarung
Privatheit
Bibliothek
2024
©
Time.Graphics
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Excellent (Trustpilot Reviews)
Based on 115+ reviews
Write your own review on
Trustpilot.com
Comments