29
/de/
de
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
Erstellen
Public Timelines
Bibliothek
FAQ
For education
Cabinet
For educational institutions
For teachers
For students/pupils
Herunterladen
Export
Eine Kopie erstellen
In der Webseite integrieren
Editieren
Einsichten 301
0
0
S06 ORT History
Wurde erstellt
Valen Hung
⟶ Wurde aktualisiert 1 Dez 2017 ⟶
List of edits
Zeitlinien vom
Valen Hung
:
8 Nov 2017
0
0
379
Taoyuan Toastmaster Group
Kommentare
Ereignisse
TAO Chamber Temperature runaway 4h15m
Provide All S/N of Tin Can/Tin Cards and OBOs.
1) Quote was provided by GF for long term protection plan. 2) OBO loopback was swapped for T0 OBO-0 verification under room temp. testing.
6 TiN Card GNET failed on the same period on 21:30 and 22:30, It is new finding we’ve never ever seen it before.
Perioden
1st Run ORT with room temp. and all results positive
2nd & 3rd Run ORT for QSFP PRBS verification. Temp. is not a troubling fact.
4th Run ORT with Thermal + Power cycling profile. OBO and DDR and QSFP are major issue.
Short term protection trail run are good for solution implementation at TAO and iPT both.
5th and 6th Run ORT for T0 OBO-0 hard module verification. Issue cannot duplicated.