30
/de/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
June 15, 2024
Public Timelines
FAQ
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Open cabinet
For educational institutions
For teachers
For students
Open cabinet
Erstellen
Close
Create a timeline
Public timelines
Library
FAQ
Herunterladen
Export
Eine Kopie erstellen
Premium
In der Webseite integrieren
Personal Project Grade 10
Editieren
Wurde aktualisiert 18 Jan 2019
1
0
304
Share
Autoren
Created by
Paphinvit Chris Hartono
List of Edits
Attachments
Comments
Ereignisse
Broad Categories Choices Day 1: Choosing which field of interest i'm most interested in
Personal Project Agreed and Finalized Day 4: Consult with Mr Theo (Supervisor) and get a signature for approval
Personal Project: Timeline Day 5: Submit the timeline of the process of the whole project
Personal Project Criteria Day 8: Submit personal product criteria to Mr Theo (Supervisor) and have the Second Official Meeting
Brainstorming #1 Day 2: Brainstorming ideas that could benefit us
Brainstorming #2 Day 3: Stick with the idea of making a Smart Mirror
Meeting Day 6: First official meeting: discussion
Research Day 7: Research more about the Smart Mirror (cost, size, materials)
Research Day 9: Research more about Raspberry Pi, understand how does it function
Midpoint Checkpoint Day 11: Discuss the progress made and have the Third Official Meeting (CHANGED) EDIT: Reconciled with Mr Theo for the change of plan. Instead of Smart Mirror, "Green" Teleprompter is proposed.
Preparation Day 10: Start buying the materials needed
Preparation Day 12: Start making the Smart Mirror (Coding in the Raspberry Pi) EDIT: Start buying Acrylic Sheet 8x10, 2mm thick and Craft Foam.
Preparation Day 13: Coding in the Raspberry Pi #2 EDIT: Prepare bamboo sticks for the tripod/stand of the teleprompter.
Preparation Day 14: Clearing things up and start making the frame EDIT: Start assembling the parts together into place
Preparation Day 15: Finalize the product, add some finishing to it
Draft Report Day 17: Submit a DRAFT report to Mr Theo (Supervisor) for checking and feedback.
Draft Report Day 16: Start making the draft of my report: At least get the idea
Draft Report Day 18: Continue with the draft
Draft Report Day 19: Send draft to Mr Theo (Supervisor)
Draft Report Day 20: Finalizing the draft and make edits
Draft Report Day 21: Submit the Final Report
Personal Project : END
Personal Project: START
About & Feedback
Vereinbarung
Privatheit
Bibliothek
2024
©
Time.Graphics
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Excellent (Trustpilot Reviews)
Based on 115+ reviews
Comments