11 St. 2 Min, 23 Dez 1960 Jahr - SL-1 Shut Down for Planned Maintenance
Beschreibung:
It was planned that maintenance on certain components of the whole system would be performed during the succeeding twelve days
and the reactor would again be brought to power on January 4,1961. At the time of the shut-down, margin for the cold reactor was probably 2 to 3%, assuming rod worth was essentially unchanged from earlier measurements and calculations. Criticality could have been probably been produced by withdrawal of rod #9 approximately 17 inches from the reference zero position. Much uncertainty surrounds this number.
Zugefügt zum Band der Zeit:
SL-1 Reactor Accident Timeline
Datum: