LAMP CRUSHING MACHINE
Editar
Atualizado 15 set 2020
0
0
1029
Share
Autores
Created by
Pongsakorn Onpotha
List of Edits
Attachments
Comments
Aerosol Can Disposal IMPORT
By
Pongsakorn Onpotha
4 abr 2019
0
0
447
TIMELINE RESUME / CV
By
Pongsakorn Onpotha
9 meses atrás
0
0
307
ACOUSTIC PANEL - BHQ
By
Pongsakorn Onpotha
1 meses atrás
0
0
283
Work Permit
By
Pongsakorn Onpotha
19 dias atrás
0
0
274
OVERMOD
By
Pongsakorn Onpotha
23 dias atrás
0
0
153
LAND DEAL (7+1 Rai)
By
Pongsakorn Onpotha
7 meses atrás
0
0
140
Recruiter
By
Pongsakorn Onpotha
2 meses atrás
0
0
135
SOLAR ROOFTOP
By
Pongsakorn Onpotha
17 dias atrás
0
0
96
Eventos
Factory Visitting
Officially Deal @ Mahidol
Private project initial
Project Decision Making
Kickoff deal with Factory
1st 3D Machine Design@Home
Open deal with BU
1st Project Kick-off (Officially)
Project Charter Outline
2nd Meeting @ MU - ITAP
Visit Vali-Tech
Onsite Survey @ W2E Plant
3rd LCM Meeting
Submit ITAP Register Form
ITAP Project Confirmed
Submit proposal & MOU
ITAP Project Approval
ITAP Project Start Date
4th LCM Meeting
5th LCM Meeting
6th LCM Meeting
1st Project Procument
1st Ordering Prototype
80% Prototype Build
Prototype Structure Completed
7th Meeting & LCM Demo
machine Structure started
1st Prototype Testing
Crusher Housing & Testing
Changing Crusher Teeth
Onsite Wind test and Crush Test
90% Structure complete
75% Structure
Start Machine Control
Start Real Crushing Teeth
1st LCM Real Test
Fixed & Final Testing
submit to Painting Factory
Install Equipment to LCM & Testing
Painting Done
Color Problem
Color Solution
Transport & 1st Day Installation
8th LCM Meeting & KlongTom
Motor & Prototype
KlongTom & Kickoff Real Machine
line Cooperate
Day 2 onsite Installation
Day 3 onsite Installation
Day 4 Completed Installation
Ordering side plate
Preparing (1)
Preparing (2)
Line group
ITAP officially Project Close
Motor Spec Confirm
Shaft Stuff
Filter & Blower
New 3D Design
Request For Certification & Report V1.0
Project Closing Report
Project Close ( Private meeting) @ Mahidol
Project Close - Review @W2E
Official Machine Certification - APPROVAL
ITAP Payment Approved
15,000 Lamp @ W2E Start to Disposal
Machine Damage Only Electrical Line problem
Message To Start Phase 2
ITAP Payment Request Revise
ITAP PAYMENT ALREADY
Official LCM V2 Meeting 1 @ Mahidol
Official LCM V2 Kick-Off By Email was started
Licence Problem (DIW)
Submit LCM Spec Sheet to DIW for Licence Approval again.
Mahidol Team Onsite @ Pra-Chin Land Field
Propose Phase-2 ( Produce The Machine)
Submit ** Project Extended
Submitted Project Closed Report PHASE - 2
ITAP Requested " Project Closing Appointment " ( Khun KooN)
Imcome Check 168,000 B [i got only 28K]
Períodos
Project Research & Feasibility study (Globally)
SongKran Day (Off)
Installation period
Painting Period
Getting Requirement & Concept Drawing Machine
Machine Service Factor Stuff
Blower Stuff
Real LCM Building
Color Fixed & cover plate Solution
Project Operation and Building Timeline
Project Extended preriod
About & Feedback
Acordo
Privacidade
Biblioteca
2024
©
Time.Graphics
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Excellent (Trustpilot Reviews)
Based on 115+ reviews
Comments